Title: 7:55 p.m. - 8:10 p.m. Consideration to Initiate Final Design of Robinson Trust Sidewalk Projects at Johnson Street, SW, Saint Andrews Drive, NE, Saint Bernard Drive, NE, Ridge Road, SW, and Frederick Street, SW.
Attachments: 1. 1. Location Maps - February 26, 2024, 2. 2. Proposals From Urban - August 23, 2023, 3. 3. Eng Report- Johnson St SW - December 2023, 4. 4. Eng Report- Saint Andrew Dr NE - December 2023, 5. 5. Eng Report- Saint Bernard Dr NE - December 2023, 6. 6. Eng Report- Ridge Rd SW - December 2023, 7. 7. Eng Report- Frederick St SW - December 2023, 8. 8. Notifcation Letters - February 12, 2024, 9. 9. Regulatory Requirements for 24-4268 Agenda Items Rev - February 06, 2024

Subject:

Title

7:55 p.m. - 8:10 p.m. Consideration to Initiate Final Design of Robinson Trust Sidewalk Projects at Johnson Street, SW, Saint Andrews Drive, NE, Saint Bernard Drive, NE, Ridge Road, SW, and Frederick Street, SW.

Body

 

Date(s) of Prior Council Consideration of this Issue:

On Aug. 28, 2023, Council authorized DPW to initiate Engineering Reports for sidewalk projects on Johnson Street, SW, Saint Andrews Drive, NE, Saint Bernard Drive, NE, Ridge Road, SW, and Frederick Street, SW.

 

EXPLANATION AND SUMMARY

Former Councilmember Maud Robinson, who passed away in March of 2019 just shy of her 97th birthday, left the bulk of her estate to the Town of Vienna for the specific purpose of building sidewalks, over a five-year period, in areas where they are not already planned or likely to be funded through grants or new construction.

 

Department of Public Works (DPW) believes that these projects are important to make Vienna a more walkable community and are important to expanding the sidewalk network that will link projects together and provide safe accessible routes.  Additionally, these sidewalk projects will include ADA-accessible ramps and new crosswalks.  The new sidewalks with these safety amenities will allow more residents including those with mobility issues, those with strollers, and those who do not feel safe walking in the street to safely enjoy getting around town and reaching destinations.

 

The engineering reports that were prepared for the five streets provide additional information and analysis and were used by DPW to make recommendations to Council regarding which side of the street to build the sidewalk projects.  The reports provided a conceptual design for construction of sidewalk on each side of the street and provided analysis of the pros and cons that support each recommendation.  Factors considered for recommending sidewalk locations include less impact on trees, less grading on private property, less constructability issues such as utility poles that cannot be designed around, connectivity to adjacent sidewalks, trails, schools, parks, shopping areas or other destinations, and cost.

 

DPW requests that the Council authorize DPW to utilize its On-Call Engineering Services Contract, RFP 19-01 with Urban, Ltd. to prepare the final design of these projects.  The final design activities are described as tasks 4, 5, 6, 7, 8, and 10 in the attached proposals from Urban, Ltd. and consist of preparation of the 30%, 95%, and 100% plans, construction cost estimates, and other tasks related to the final design of these projects. The specific locations and costs of the final designs are:

 

                     Odd numbered addresses (west side) of Johnson Street, SW, from Glen Avenue to end of street- $29,750.00

                     Even numbered addresses (south side) of Saint Andrews Drive, NE, from Maple Avenue to Westbriar Drive- $31,000.00

                     Even numbered addresses (south side) of Saint Bernard Drive, NE, from Maple Avenue to Westbriar Drive- $27,500.00

                     Even numbered addresses (south side) of Ridge Road, SW, from Hillcrest Drive to Frederick Street- $25,250.00

                     Even numbered addresses (west side) of Frederick Street, SW, from Tapawingo to Kingsley Road- $36,750.00

The total cost of these five final designs is proposed as $150,250.00.

 

DPW hosted a public meeting for each project where a presentation of the engineering report was provided.  The meetings for Ridge Road, SW, and Frederick Street, SW, were held on Feb. 7, 2024; and the meetings for Johnson Street, SW, Saint Andrews Drive, NE, and Saint Bernard Drive, NE, were held on Feb. 8, 2024.

 

Property owners and residents were notified of the Town Council meeting scheduled for Feb. 26, 2024 via a letter dated Feb. 12, 2024.

 

NEXT STEPS:

If approved by Council, DPW will issue a purchase order to Urban, Ltd. for final design of these projects.  After the design has been completed, DPW will obtain a construction cost proposal from Arthur Construction Co., Inc.  After reviewing the proposal, DPW will request approval from Council to spend the amount of the proposal for the construction.

 

Anticipated Completion Timeframe:

DPW anticipates returning to Council in late spring 2024 with a request to spend the amount of the proposal for the construction of the projects.  DPW anticipates the construction of these projects to start in summer 2024.

 

Strategic Plan Initiative: Vienna is a safe community and an efficiently mobile community

 

Departmental Recommendation:  Recommend approval.

 

Finance Recommendation:  Recommend approval.

 

Purchasing Recommendation: Recommend approval.

 

Town Attorney Recommendation:  The Town has an engineering services contract for the proposed design work and the Town Council may approve the proposed expenditure of funds for engineering design professional services in the discretion of the Town Council.

 

Town Manager's Recommendation:  I recommend the Town Council authorize me to apply to the Maud Robinson Trust to Initiate Final Design of Robinson Sidewalk Projects, on the streets in this agenda item, as presented.

 

Cost and Financing:  $150,250.00

Account Number:  424RTSP042-DESIGN-ENGINEER (Johnson St SW)

                                                    300-000-0000-38445-48801

                                                    424RTSP043-DESIGN-ENGINEER (Saint Andrews Dr NE)

                                                    300-000-0000-38445-48801

                                                    424RTSP044-DESIGN-ENGINEER (Saint Bernard Dr NE)

                                                    300-000-0000-38445-48801

                                                    424RTSP045-DESIGN-ENGINEER (Ridge Road SW)

                                                    300-000-0000-38445-48801

                                                    424RTSP046-DESIGN-ENGINEER (Frederick St., Tapawingo to  

                                  Kingsley Rd) 300-000-0000-38445-48801

                                                   

Decision Needed by This date: Feb. 26, 2024

 

Prior Funding Approval:

FY24 (08/28/2023)

- Johnson St SW - $30,300 using 300-000-0000-38445-48801 (Engineering Design), Maud Robinson Sidewalk Trust fund.

 - Saint Andrews Dr NE - $33,050 using 300-000-0000-38445-48801 (Engineering Design), Maud Robinson Sidewalk Trust fund.

 - Saint Bernard Dr NE - $29,100 using 300-000-0000-38445-48801 (Engineering Design), Maud Robinson Sidewalk Trust fund.

- Ridge Road SW - $24,200 using 300-000-0000-38445-48801 (Engineering Design), Maud Robinson Sidewalk Trust fund.

- Frederick Street SW - $45,050 using 300-000-0000-38445-48801 (Engineering Design), Maud Robinson Sidewalk Trust fund.

 

PROPOSED/SUGGESTED MOTION

Recommended Action

"I move to authorize the Town Manager to apply to the Maud Robinson Trust to Initiate Final Design of Robinson Sidewalk Projects on the following streets: 

                     Odd numbered addresses (west side) of Johnson Street SW from Glen Ave to End of street

                     Even numbered addresses (south side) of Saint Andrews Drive NE from Maple Ave to Westbriar Dr

                     Even numbered addresses (south side) of Saint Bernard Dr NE from Maple Ave to Westbriar Dr

                     Even numbered addresses (south side) of Ridge Road SW from Hillcrest Dr to Frederick St

                     Even numbered addresses (west side) of Frederick Street SW from Tapawingo to Kingsley Rd

And to approve the spending of $150,250.00 with Urban, Ltd to prepare the Final Design of the subject projects.”

 

Or